Scope and approach
An opening is a coordinated assembly.
Reconcile plans, opening schedules and finish details. Identify door and frame types, sizes, handing, preparation and the hardware interface by opening ID. Required ratings and assembly compatibility are confirmed against the project specification.
Door and frame schedules with opening references
Unit, common-area and back-of-house distinctions
Hardware, access-control and glazing interfaces
Carry the finish intent through.
Identify trim profiles, material, finish basis and millwork details by location. Separate recurring unit packages from lobbies, amenity spaces and specialty areas so selections and quantities remain clear.
Agree what reaches the field.
The proposal distinguishes materials supply from managed installation and names preparation, storage, protection, finishing and adjustment responsibilities. Changes to an opening or finish selection return to review before release.
What to bring.
Which opening and finish schedules are current?
Which doors, frames, trim and millwork areas are in this package?
Who furnishes hardware and access-control components, and who coordinates preparation?
How should unit types, floors and common areas be released?
From review to agreed work
Plan the scope.
Reconcile the schedules
Compare opening IDs, types, quantities and finish details to the issued plan set.
Approve selections and preparation
Review assembly requirements, samples and hardware interfaces before ordering.
Package for the sequence
Identify building, floor, unit type or area on the agreed releases and delivery information.
Review installed scope
Coordinate agreed installation, adjustments, punch items and closeout with the field team.
Can unit packages and common areas be reviewed together?
Yes. Keep the unit-type matrix and the common-area schedules identifiable within the same bid package. Distinct specifications, finishes and installation requirements remain separate in the agreed scope.
Is hardware automatically included?
No. Identify the hardware supply, installation and preparation responsibilities in the bid documents. Hardware is coordinated as an interface to this package; inclusion is stated in the proposal.
How are rated openings reviewed?
Provide the required ratings with the opening and hardware schedules. The exact assembly, labels, preparation and compatibility are checked against the specification and required submittal approvals before release.