Skip to content
All Abel
All services Commercial / Multifamily New Construction

Storefronts

Define glazed entrances and storefront assemblies with clear system, hardware and adjacent-trade boundaries.

AI-generated commercial storefront concept with dark aluminum frames, fixed glazing and glass entry doors
AI-generated planning concept. Not a completed Abel project or product specification.

Scope and approach

Define the glazed frontage.

Bring elevations, sections and entrance details for the storefront areas in scope. Identify framing, glazing, operable components, finish and connection conditions by location. The exact system is established through project review and approval.

Coordinate the entrance.

Identify who supplies and installs entrance hardware, access control, electrical connections and adjacent work. Required operation, accessibility and life-safety details must be reviewed for the specified assembly.

  • Entrance and glazing schedules
  • Hardware sets and access-control coordination
  • Perimeter, threshold and adjoining-wall details

Hold fabrication to the approved basis.

Agree required shop drawings, samples, field dimensions and review responsibility. Changes to openings, system selection or finish must be resolved before the affected material is released.

What to bring.

  • Which elevations and storefront or entrance marks are included?
  • What framing, glazing, finish and performance requirements are specified?
  • Who owns field dimensions, entrance hardware, access control and perimeter work?
  • Which approvals and enclosure milestones control fabrication and installation?
From review to agreed work

Plan the scope.

Review the frontage

Identify system boundaries, entrance marks, adjacent work and the current document basis.

Coordinate the submittal

Resolve assembly requirements, hardware interfaces, samples and required shop-drawing review.

Verify and release

Complete required dimension checks and approvals before fabrication or procurement.

Install and close out

Sequence the agreed installation, entrance adjustments, field review and closeout documents.

Questions, answered

Before the next step.

What if the documents call for curtain wall?

Identify the exact system and its location in the bid invitation. We review that requirement separately and confirm whether it fits the proposed scope before including it.

Who approves shop drawings and field dimensions?

The project team establishes review authority and field-verification responsibility in the agreed scope. Required approvals and dimensions must be resolved before the affected assembly is released.

Can access-control hardware be coordinated?

Provide the hardware and access-control documents with the entrance schedule. The proposal identifies coordination, supply, preparation, installation and electrical responsibilities rather than assuming one trade owns them all.