Interior doors

A repeatable opening schedule, with each plan's differences kept visible.

AI-generated new-home interior study with aligned openings and coordinated painted doors
AI-generated planning concept. Not a completed Abel project or product specification.

Scope and approach

Set the community opening standard

Establish the approved door design, construction, heights and paint or stain basis. Define slab versus prehung scope, frame and jamb requirements, casing and included hardware preparation in the same package.

  • Opening IDs tied to the current plan and schedule
  • Width, height, swing, handing and jamb depth
  • Single, pair, pocket, bifold and other approved applications

Keep plan differences in view

A repeated door style does not make every opening identical. Separate elevation changes, ceiling-height options, study conversions and other approved plan variations before preparing the house package.

Release the selected house

Match the house's plan revision and selected options to its opening schedule. Confirm the receiving contact, preparation and delivery sequence. Installation and any return visit belong in the agreed scope.

What to bring.

  • Which plan and option revisions govern this community?
  • Which openings change height, handing or function by option?
  • Are frames, casing, hardware preparation and installation included?
From review to agreed work

Plan the scope.

Review the opening schedule

Reconcile plan references, quantities and configuration with the community standard.

Approve the exceptions

Identify plan-specific and selected-option changes before release.

Prepare by house

Connect the approved schedule to the house identifier, receiving plan and agreed work.

Questions, answered

Before the next step.

Can one door standard cover several plans?

Yes, the design can be common while quantities, sizes, handing and special openings remain specific to each plan and option. Review those differences before a house is released.

Does a door package include hardware and installation?

Only when listed in the agreed scope. Slabs, prehung units, hardware preparation, hardware supply and installation should each be explicit.