Scope and approach

Read the full elevation set

Coordinate the window schedule with plan elevations, room layouts and approved options. Record dimensions, operating style, frame and finish direction, glass requirements and combinations by opening.

Confirm the proposed configuration

Required performance, glass and code-related criteria come from the project documents and verified product information. Confirm the exact unit and assembly instead of carrying a specification across different products.

Agree the installation interfaces

Identify who verifies openings, prepares the substrate, installs the unit and completes flashing, sealants and surrounding finishes. Confirm delivery staging and protection before scheduling the house package.

  • Plan, elevation and opening schedule revision
  • Operating style, dimensions and selected options
  • Installation, weatherproofing and adjacent-work boundaries

What to bring.

  • Which elevations and options alter the window or slider schedule?
  • What verified performance documentation is required?
  • Who owns field verification, flashing and surrounding repairs?
From review to agreed work

Plan the scope.

Reconcile schedules and elevations

Keep the proposed configuration connected to each opening and option.

Review product and field requirements

Resolve required documentation and installation interfaces before approval.

Confirm procurement and delivery

Agree product-specific lead times and house readiness with the project team.

Questions, answered

Before the next step.

Are all windows on a plan the same configuration?

No. Elevations, room uses, dimensions and approved options can change the schedule. Review the exact selected configuration for the house.

Can you confirm a lead time from this page?

Lead times depend on the approved product, configuration, quantity and current availability. Confirm the actual procurement and delivery dates during program review.